Sign In | Join Free | My gimpguru.org |
|
Brand Name : SLET
Model Number : SL-300
Certification : CE ISO
Place of Origin : China
MOQ : 1 set
Price : USD 40,000- 750,000 Per set
Payment Terms : T/T
Supply Ability : 20 sets per month
Delivery Time : 30 working days after the deposit
Packaging Details : PE paper & iron frame
Material : SS304 / 316
Heating : gas / electricity / steam
Control : automatic / Semi-automatic
Exhausting : Indoor or outside
Brewhouse : kettle, lauter, Mash, whirlpool in one unit or 4 seperate
Fermenters : 100l conical cylinder tank or 200l fermenter
300L small taproom pub idia pale ale red copper beer making machine
Output/Brew | 3HL |
Brew/Week | 2~6 |
Output/Week | 6~18HL |
Electric Supply | 3phase / 380(220, 415,440…)v/50 (60)Hz Single Phase/ 220(110, 240…)v/50(60)Hz |
Heating Source | Electric/Steam |
Area Request | >30M2 |
Brewmaster | 1 |
1. Brewhouse: two vessels, three vessels, four vessels brewhouse
2. Heating medium: steam heating
3. Insulation material: rock wool. Insulation thickness: 100mm
4. Mash tank; hydrator, mixer, steam heating jacket
5. Lauter tun: rake, agitator, false bottom, hydrator
6. Brewkettle, steam heating jacket, inner steam heating deivce
7. Whirlpool tun: whirlpool entry
Product dvantages :
1- we support installation and debugging, technical guidance on site
2- engineer will teach how to brewing and running the production line, test the beer’s quaity
3- design drawing for free
4- competitive and low price of raw material
5- high quality of the beer equipment
6- competitive price
7- highly automatic or manual operation
8- material: SS304 or red copper
Beer making machine specification list
ii Configuration
Item | Capacity | Material | Heating method | Mixed mode |
2-vessel | 100L | 304 stailess steel(food grade) | Steam &electricity &fire | [Mash+Lauter(upper)+Whirlpool(lower)]+Kettle |
200L | ||||
250L | [Mash+Lauter(upper)+HLT(lower)]+Kettle+Whirlpool | |||
500L | ||||
3BBL | [Mash+Lauter(upper)+Whirlpool(lower)]+Kettle | |||
3.5BBL | [Mash+Lauter(upper)+HLT(lower)]+Kettle+Whirlpool | |||
5BBL | [Mash+Lauter(upper)+Whirlpool(lower)]+Kettle | |||
7BBL | [Mash+Lauter(upper)+HLT(lower)]+Kettle+Whirlpool |
Beer brewing system’s analysis
item | SLET-0.1 | SLET -0.2 | SLET -0.3 | SLET -0.5 | SLET -1.0 | SLET -2.0 |
Production capacity | 100L/day | 200L/day | 300L/day | 500L/day | 1000L/day | 2000L/day |
floor space | 15m2 | 25m2 | 35m2 | 50m2 | 80m2 | 120m2 |
Total power | 12kw | 12kw | 12kw | 15/36kw | 22/72kw | 31/144kw |
Maximum hourly water consumption | 0.2m3/h | 0.4m3/h | 0.5m3/h | 1.0m3/h | 1.5m3/h | 2.0m3/h |
Total water used | 0.5m3/d | 1.m3/d | 1.5m3/d | 2.5m3/d | 5m3/d | 10m3/d |
Consumption of malt | 20kg | 40kg | 60kg | 100kg | 200kg | 400kg |
Consumption of hops | 60g | 120g | 180g | 300g | 600g | 1.2kg |
Yeast | 100g/1L | 200g/2L | 300g/3L | 500g/5L | 1kg/10L | 2kg/20L |
Maximum steam | 0.017t/hour | 0.017t/hour | 0.05t/hour | 0.10t/hour | 0.20t/hour |
Shun Long Servie
Pre-sale service:
1. Make the equipment details specifications to customers
2. We can supply the OEM process, according to the drawings, the samples to customized the beer equipment
3. Layout plan in CAD drawings of beer machine.
4. The competitive price and the timely delivery.
After-sale service:
1. Provide the required customs declaration files, timely tracking freight
2. The equipment main configurationgs for 3 years warranty time, such as the valves and so on.
3. Professional engineers for installation, commissioning, maintenance.
4. Directed by executable remote installation(with no experience in beer, equipment installation experience, can also perform operations, please make this clear before custom equipment, we have successful cases)
If you are interested in our machines, please don't hesitate to contact me.
We can meet you what you want, looking forward to your inquiry. Let's go together in the process of cooperation to the good prospects.
![]() |
Pale Ale Red Copper 2.5 Bbl Brewing System 2-6 Brew / Week For Small Taproom Images |